• Green check mark icon indicating benefit Free shipping over ÂŁ159
  • Green check mark icon indicating benefit Open purchase 30 days
  • Green check mark icon indicating benefit Fast delivery
  • Green check mark icon indicating benefit Customer service 0300-308 60
  • Qliro logo showing secure payments Secure payments with Qliro
EN / EUR EN flag ▾
Green check mark icon indicating benefit Free shipping over ÂŁ159 Green check mark icon indicating benefit Open purchase 30 days Green check mark icon indicating benefit Fast delivery Green check mark icon indicating benefit Customer service 0300-308 60 Qliro logo showing secure payments Secure payments with Qliro
EN / EUR EN flag ▾
Heart 0
Cart
×

Your basket is empty.

Installation of additional lights in Kungsbacka

You will receive the LED ramp and additional lights installed in our workshop in Kungsbacka, near Gothenburg and Varberg. The installation takes 1-3 hours depending on the work and XBB is included.

  • Ready in 1-3 hours depending on work
  • XBB included as standard
  • Fixed price, assembled and ready
  • You pay on site when the job is finished.
S
We look for what suits your car


Price assembled and ready

The price assembled and ready is the product and assembly together, at a fixed price. You pay on site when the job is finished.

We install all LED ramps with XBB, which connects the ramp to the car's high beams without cutting the wiring. If you have an older car with halogen lights, it may be enough without XBB, and then it will be cheaper. We check your car before we confirm the time.

Book an appointment for installation in Kungsbacka

You book an appointment by choosing what you want to install and a free time in the calendar. We will check your car and confirm within 24 hours.

1What do you want to install?

2Choose day and time

Loading calendar

Free timesFully booked

3Your details

Thank you, the time is reserved.

We will check your car and get back to you within 24 hours with a price and confirmation. You pay on site when the installation is complete. A copy is in your email.

Questions? Call 0300-308 60.

Installation of additional lights for Kungsbacka, Gothenburg and Varberg

You can have your extra lights installed at our location in Kungsbacka, approximately 25 minutes from Gothenburg and 35 minutes from Varberg. Customers come here from all over northern Halland and the Gothenburg area, for example Mölndal, Onsala, SÀrö and FrillesÄs.

We install LED lights and additional lights on passenger cars, electric cars, pickups and transport trucks. You leave the car in the morning or after lunch and pick it up the same day with the lights ready and set.

The workshop in Kungsbacka

The workshop is located in the same building as our store in Kungsbacka. While we are assembling, you can wait in the store or borrow an office space.

Installations Tuesday-Friday, starting at 9 am or 1 pm.

0300-308 60
bokning@xenonkungen.se

The warranty on the installation is valid for the same period as the warranty on the product.

Frequently asked questions

How much does it cost to install extra lights?

Installation of LED lights costs SEK 4,495 with XBB and SEK 2,995 without XBB. Ticon costs SEK 2,995 to install and changing to LED in the low beam adds half an hour.

How do I pay?

You pay on site in the store when the assembly is complete. No payment is made when you send the booking request.

When will I receive confirmation?

The time is reserved immediately when you send the request. We will check your car and confirm the price and time within 24 hours.

What is XBB and does my car need it?

XBB connects the LED ramp to the car's high beams without cutting the wiring. We install with XBB as standard. If you have an older car with halogen lights, it may be enough without it, and then it will be cheaper. We check your car before we confirm.

What is included in the price?

The price assembled and ready applies to the product and assembly together. XBB is included on the LED ramps. Changing to LED in the low beam adds half an hour.

How long does the installation take?

LED ramp with XBB takes about 3 hours and Ticon about 2 hours. Changing to LED in the low beam adds about half an hour.

Do you live far from Kungsbacka?

We also install at more than 25 workshops around Sweden, and you book a workshop directly when you shop. See extra lights with installation near you.